Changxing Power Plant
Yuhuan Power Plant is located at Xiaqingtang, Damaiyu Development Zone of Yuhuan County, Taizhou, Zhejiang. The site is in the southeast coast of Zhejiang province, east bank of Leqingwan, west of Yuhuan peninsular, 409km from Hangzhou city, 94km from Taizhou city and 80km from Wenzhou city. The plant site is surrounded by mountains at three sides with the remaining side facing the sea. The site is consisted of farm land and beach with total area of 110 hectares. Huaneng Yuhan Power Plant is the country’s ultra-supercritical units manufacturing localization support project. The main steam pressure is 26.25Mpa (a), the main steam and reheat steam temperature is 600℃. The project is developed, constructed by Huaneng Power International, Inc. the planned capacity of the power plant is 4x1000MW units. The first phase consists of two units, which are expected to commence operation in 2007. The second phase will be built successively and is expected to be completed in 2008. Once completed, Yuhuan Power Plant will be No.1 in China in terms of single unit capacity within top ranks in Asia.